How much does excavation work cost in Cheltenham?+
Every project is priced individually based on size, materials, ground conditions and access. We provide a fixed written quote after a free on-site survey.
Do I need planning permission for excavation work?+
For most landscaping-scale excavation, no. For new dwellings, extensions over 50m³ of dig, basements, swimming pools and changes of level over 600mm in some areas - possibly. We flag at quote stage and coordinate with planning officer where needed.
What happens to the soil you dig out?+
Removed under Environment Agency Waste Transfer Notes to a registered tip. Inert material (clean soil, hardcore) to inert tips. Mixed or contaminated to active or hazardous tips. Waste Transfer Note copies retained and supplied at handover.
Can you work in restricted access situations?+
Yes - 0.8m wide mini-excavators access most domestic gardens. Where no access exists, hand-dig and conveyor systems are used. Site visit confirms access at quote.
Are you insured for excavation on my property?+
Yes - Fully insured.
What about underground services?+
CADS service plans pulled before dig, CAT scan on site before any excavation, trial-pitting by hand at suspected service crossings. Strike risk minimised; never zero, but documented mitigation is your protection.
Can you work with my architect or builder?+
Yes - we sub-contract groundworks to builders, architects and developers as well as direct-to-homeowner. Method statements, RAMS and insurance documentation supplied as required.
How quickly can you start?+
Smaller jobs (1–2 days): typically 1–2 weeks lead time. Larger projects: 3–6 weeks depending on plant scheduling and waste-removal coordination.
What's your guarantee?+
Workmanship guarantee on levels, drainage installation and any built elements (footings, foundations) per the scope. The dig itself is a one-time activity - the guarantee covers what's built on or from it.